Event Picture Display

Lower Parel bridge repair work

Workers start the repairing work of Lower Parel bridge before the onset of monsoon season during the nationwide lockdown 4.0 in wake of COVID 19 coronavirus pandemic in Mumbai on Thursday, 28 May 2020.

Tags: Verticalcovidcovid 19lockdowncoronaviruslockdown 4.0Lower Parel bridgefly over

Credit balance: 0

Add to Fotobox